LOCATION:   33 Mo2 Ayuthaya-Angthong Highway, T. Posa, A. Muang Angthong, Thailand.

 

CLIENT:       Thai Rayon Public Co., Ltd.

PERIOD OF SERVICES:  January 2017

 

FINANCED BY:           N/A

 

ASSOCIATED FIRMS:    N/A

 

DESCRIPTION OF PROJECT:

The Auxiliary building is 5storied. The building has a rectangular. It has a rectangular grid of columns (7X11) with an area of approximately 1,872sq.m per floor. The Building is dedicated for production of Fiber.

SCOPE OF SERVICES:

  • Visual inspection is limited to those areas and sections of factory that is fully accessible and visible to the inspectors (IEC) at the time of inspection.
  • Structural components concealed behind finished surface could not be inspected.
  • Random checks of the embedded reinforcement in the concrete components using Corrosion analysis by Half-Cell potential.

 

KEY FACTORS:

 

  • Non-Destructive Testing using Half-cell potential measurements
  • Building visual inspection

 

 

 

LOCATION:    Huay Bong, Dankhuntod, Nakhonratchasima, Thailand.

 

CLIENT:       DEMCO PUBLIC COMPANY LIMITED

PERIOD OF SERVICES:  April 2018

 

FINANCED BY:           N/A

 

ASSOCIATED FIRMS:    N/A

 

DESCRIPTION OF PROJECT:

KR2-Huay Bong Wind farm Project. After recommissioning and operate the turbine it is that found some cracks of foundation slab in WTG 23A. Therefore IEC would instruct Demco to investigate crack width, number of crack, crack length, crack depth of foundation slab WTG 23A.

 

SCOPE OF SERVICES:

  • Visual inspection is limited to those areas and sections of foundation that is fully accessible and visible to the inspectors (IEC) at the time of inspection.
  • Checks of the crack depth by Ultrasonic Pulse Velocity (UPV) in the concrete components.

 

KEY FACTORS:

 

  • Non-Destructive Testing using Ultrasonic pulse Velocity Method (UPV) to determine crack depth.
  • Foundation visual inspection

 

 

 

 

LOCATION:    Huay Bong, Dankhuntod, Nakhonratchasima, Thailand.

 

CLIENT:       DEMCO PUBLIC COMPANY LIMITED

PERIOD OF SERVICES:  April 2018

 

FINANCED BY:           N/A

 

ASSOCIATED FIRMS:    N/A

 

DESCRIPTION OF PROJECT:

WTG foundation9 WTGs of type A KR2-Huay Bong Wind farm Project. Recommissioning and operate the turbine It is that found some cracks of foundation slab in several turbines, especially all turbines. Therefore IEC would instruct Demco to monitor crack width, number of crack, crack length of foundation slab type A amount 9 WTG.

 

 

SCOPE OF SERVICES:

  • Visual inspection is limited to those areas and sections of foundation that is fully accessible and visible to the inspectors (IEC) at the time of inspection.
  • Checks of the crack depth by Ultrasonic Pulse Velocity (UPV) in the concrete components.

 

KEY FACTORS:

 

  • Non-Destructive Testing using Ultrasonic pulse Velocity Method (UPV) to determine crack depth.
  • Foundation visual inspection

 

 

 


DESCRIPTION OF PROJECT:

 

According to underground water pipe was damaged and consequently damage the underground pavement structure. Department of Highway (DOH) objected to determine the leakage and exact damaged water pipe location. Moreover, void detection under pavement structure was one of the project scopes of work to evaluate the repairing method and cost.

International Engineering Consultants Co., Ltd. (IEC) was awarded contract to carried out the project.  The works are including underground utility and void under pavement detection using Ground Penetration Radar (GPR) technique.

SCOPE OF SERVICES:

·         Underground Utility determination

·         Void or pavement structure damage area due to the leakage of water from the damaged water pipe.

 

KEY FACTORS:

·         Underground Utility determination using Ground Penetration Radar (GPR)

 

DESCRIPTION OF PROJECT:

The investigation site is located at stockpile area and mill area within Chatree Gold Mine. Some holes underneath the ground are discovered in during the preparation for construction of Production Plant Expansion Project. Consequently, the GPR survey is proposed to observe the void under the soil surface with course the large of settlement around this zone. The results of this type of survey are important for considering the method to protect the damage from that void.

International Engineering Consultants Co., Ltd. (IEC) was awarded contract to carried out the project.  The works are including survey to determine the underground hole using Ground Penetration Radar (GPR) technique.

SCOPE OF SERVICES:

·         Underground hole determination

·         Preparation the void investigation report

 

KEY FACTORS:

·         Underground hole determination using Ground Penetration Radar (GPR)