LOCATION :   Phra Nakhon Si  Ayutthaya, Thailand

 

CLIENT :       Royal Irrigation Department

 

PERIOD OF SERVICES:   May 2017 – Jul 2018

 

CONTRACT COST :  1,200,000 Baht

 

FINANCED BY:           N/A

 

ASSOCIATED FIRMS:    N/A

 

DESCRIPTION OF PROJECT:

Flood in Chao Phraya river basin has occurred several times in the past years. Partly attributed to an increase in rainfall in the Chao Phraya river basin, which has a plenty of water flow in a short time and continuously. The drainage capacity of the Chao Phraya river and other rivers cannot handle such surplus water and cannot drain the large amount of water flow that occurs in the upper of Chao Phraya river basin into the lower basin of the river through the Gulf of Thailand immediately.

Thus, Royal Irrigation Department needs to design Bang Bal – Bang Sai flood diversion channel to alleviate flooding and to manage water flow in the Chao Phraya basin.

 

 

SCOPE OF SERVICES:

  • Conceptual design of flood wall protection
  • Design criteria
  • Detailed design of flood wall protection
  • Outline construction method

 

KEY FACTORS:

  • Conceptual design and detailed design of flood wall protection