LLDPE Plant
Pelletizer building is part of theเธข?PTTPE LLDPE Plantเธข?located in Map Ta Phut, Rayong.เธข? Structural Condition Asessment and verification ofเธข?the building was required to ensure that building would be able to safely subject the 700 ton purge bin at 90 m high level. International Engineering Consultants Co., Ltd. was engagedเธข?to be the third party for verification and certify the building.เธข? The works wereเธข?carried out underเธข?เธข?Toyo-Thai Corporation Public Company Limited (TTCL), PTT Polyethyleneเธข?Co., Ltd.เธข?(PTTPE) and Bechtel International Inc.