Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 3406
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 3022
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 1651
ROM KLAO WIND FARM PROJECT 2009
MRT ORANGE LINE (EAST SECTION) PROJECT 1375
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 2986
MITTRAPHAP WIND FARM PROJECT 1188
LOM LIGOR WIND FARM PROJECT 1484
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 2956
KHLONG TRON HYDROPOWER PLANT PROJECT 1465
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 1283
FS-CHUMPORN – RANONG RAILWAY PROJECT 3377
FS BROWN LINE PROJECT 1194
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 3453
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 1789
FLOOD PROTECTION SYSTEM PROJECT 1877
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 1717
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 2154
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 1781
NAKHON SAWAN BYPASS 2170
Trang Project 1763
Engineering Detailed Design of bridge in community area (Group 4) 1758
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 1681
Condition Survey of Structural Components for Don Muang Tollway Project 1752
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 1711
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 1683
Kratoomban Project 1853
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 1788
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 5247
NAKORNRATCHASRIMA INTERCHANGE 1751
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 1781
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 1785
MRT DEPOT OF BLUELINE EXTENSION 2234
NAKHON RATCHASIMA UNDERPASS 2230
GRAND CRYSTAL AND THE CRYSTAL PROJECT 1758
CHAENGWATTANA $ SRISAMAN UNDERPASS 1750
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 1692
CUEL YARD DEVELOPMENT PHASE 4 1991
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 4684