TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION
|
10761 |
FS-CHUMPORN – RANONG RAILWAY PROJECT (2)
|
9696 |
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK
|
4621 |
ROM KLAO WIND FARM PROJECT
|
5043 |
MRT ORANGE LINE (EAST SECTION) PROJECT
|
4045 |
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION
|
9524 |
MITTRAPHAP WIND FARM PROJECT
|
3545 |
LOM LIGOR WIND FARM PROJECT
|
3966 |
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT
|
9857 |
KHLONG TRON HYDROPOWER PLANT PROJECT
|
3763 |
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS))
|
3457 |
FS-CHUMPORN – RANONG RAILWAY PROJECT
|
10392 |
FS BROWN LINE PROJECT
|
3304 |
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT)
|
11057 |
CONSTRUCTION SUPERVISION OF DUST FREE ROAD
|
3886 |
FLOOD PROTECTION SYSTEM PROJECT
|
4051 |
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II)
|
3785 |
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I)
|
4212 |
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO)
|
3818 |
NAKHON SAWAN BYPASS
|
6120 |
Trang Project
|
3697 |
Engineering Detailed Design of bridge in community area (Group 4)
|
3682 |
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway
|
3596 |
Condition Survey of Structural Components for Don Muang Tollway Project
|
3682 |
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway.
|
5038 |
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway
|
3567 |
Kratoomban Project
|
4001 |
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT
|
3825 |
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS
|
12346 |
NAKORNRATCHASRIMA INTERCHANGE
|
3676 |
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT
|
3788 |
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand
|
3651 |
MRT DEPOT OF BLUELINE EXTENSION
|
4525 |
NAKHON RATCHASIMA UNDERPASS
|
4303 |
GRAND CRYSTAL AND THE CRYSTAL PROJECT
|
3681 |
CHAENGWATTANA $ SRISAMAN UNDERPASS
|
3689 |
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF)
|
3604 |
CUEL YARD DEVELOPMENT PHASE 4
|
4087 |
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1
|
10969 |