Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 12156
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 11008
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 5198
ROM KLAO WIND FARM PROJECT 5591
MRT ORANGE LINE (EAST SECTION) PROJECT 4667
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 10857
MITTRAPHAP WIND FARM PROJECT 4073
LOM LIGOR WIND FARM PROJECT 4458
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 11165
KHLONG TRON HYDROPOWER PLANT PROJECT 4230
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 4001
FS-CHUMPORN – RANONG RAILWAY PROJECT 11824
FS BROWN LINE PROJECT 3784
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 12521
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 4311
FLOOD PROTECTION SYSTEM PROJECT 4579
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 4211
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 4666
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 4269
NAKHON SAWAN BYPASS 6744
Trang Project 4124
Engineering Detailed Design of bridge in community area (Group 4) 4121
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 4018
Condition Survey of Structural Components for Don Muang Tollway Project 4139
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 5530
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 4045
Kratoomban Project 4454
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 4278
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 13711
NAKORNRATCHASRIMA INTERCHANGE 4102
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 4280
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 4094
MRT DEPOT OF BLUELINE EXTENSION 5175
NAKHON RATCHASIMA UNDERPASS 4796
GRAND CRYSTAL AND THE CRYSTAL PROJECT 4148
CHAENGWATTANA $ SRISAMAN UNDERPASS 4140
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 4005
CUEL YARD DEVELOPMENT PHASE 4 4566
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 12245