Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 10960
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 9844
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 4798
ROM KLAO WIND FARM PROJECT 5232
MRT ORANGE LINE (EAST SECTION) PROJECT 4246
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 9690
MITTRAPHAP WIND FARM PROJECT 3739
LOM LIGOR WIND FARM PROJECT 4123
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 10001
KHLONG TRON HYDROPOWER PLANT PROJECT 3919
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 3645
FS-CHUMPORN – RANONG RAILWAY PROJECT 10535
FS BROWN LINE PROJECT 3478
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 11235
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 4034
FLOOD PROTECTION SYSTEM PROJECT 4243
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 3922
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 4337
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 3953
NAKHON SAWAN BYPASS 6312
Trang Project 3825
Engineering Detailed Design of bridge in community area (Group 4) 3832
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 3738
Condition Survey of Structural Components for Don Muang Tollway Project 3830
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 5213
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 3737
Kratoomban Project 4160
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 3954
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 12516
NAKORNRATCHASRIMA INTERCHANGE 3813
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 3949
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 3779
MRT DEPOT OF BLUELINE EXTENSION 4723
NAKHON RATCHASIMA UNDERPASS 4457
GRAND CRYSTAL AND THE CRYSTAL PROJECT 3835
CHAENGWATTANA $ SRISAMAN UNDERPASS 3840
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 3731
CUEL YARD DEVELOPMENT PHASE 4 4250
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 11103