Engineering Detailed Design of bridge in community area (Group 4)

LOCATION:  Thailand

CLIENT:     Department of Rural Roads, Ministry of Transportation

PERIOD OF SERVICES : December 2009– July 2010

CONSTRUCTION COST:  6 MB

FINANCED BY:            -

ASSOCIATED FIRMS: Siam General Engineering Consultants Co.,Ltd.                             

 

 

 

DESCRIPTION OF PROJECT:

The objection of project is to connect the bridge network which enhance the communication among people and finally lead to improvement the standard of living comply to DOR mission.

SCOPE OF SERVICES:

·        Preliminary Survey in order to prioritized and perform the public hearing.

·        Soil Investigation and Meterial resources survey.

·        Engineering Details Design.

·        Preparation Bill of Quantities and Cost estimation