Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway

LOCATION:  15th area of Department of Highway,Thailand

CLIENT:     Bureau of Road Research and Development , Department of Highways.

 

PERIOD OF SERVICES : August 2009– January 2010

 

CONSTRUCTION COST:  5 MB

 

FINANCED BY:            -

 

ASSOCIATED FIRMS: -

                               

DESCRIPTION OF PROJECT:

Due to the enhance of truck load limited to 25 tons, it is possibly effect to the bridge structural. Thus, department of highway objected to carried out the bridge condition rating assessment and performed the bridge load test to determine the capacity of the slab type bridges. The destructive and non-destructive test was carried out in term of concrete strength determination using coring, Schmidt hammer, carbonation test. The structural condition survey and

rating the slab type bridge also bridge load test at the area of Songkla was awarded to International Engineering Consutlants Co.,Ltd and Tesco Co.,Ltd. One of the most well-known non-destructive methods to evaluate the bridge structural capacity is called “Bridge Diagnostic” by attached the most accuracy strain gauge in the significant bridge element. This non-destructive test has been carried out for 8 selected bridge which various condition to ensure the capacity of bridges.

 

SCOPE OF SERVICES:

·        Bridges condition assessment and rating.

·        Executed material testing in term of concrete.

·        Executed non-destructive testing “ Bridge Diagnostic.

·        Analysis the load capacity of slab type bridge and post renovatation.

·        Evaluate the existing bridge condition to ensure the bridge capacity.